01 2 1Commencement of the development of the existing single track railway line from Kandy to Sarasavi Uyana as a double track took place under the patronage of Mrs. Pavithra Wanniarachchi, Minister of Transport. The total length of the railway line being developed is 05 km.About 64 train journeys are operated on this way daily, including several office train and school train services.The Department of Railways states that due to the 64 train journeys being operated on this single track route, the railway crossings have to be closed for a longer duration, causing traffic congestion on the highway.Accordingly, the improvement of this railway line into a double track line  was initiated in view of the delayed train operations and with a view to reducing the period of closure of the railway crossings.The construction work of this railway line will be completed in two phases and the first phase will be 03 km from Kandy to Getambe and the second phase is 02 km from Getambe to Sarasavi Uyana Railway Station.  The Department of Railways has planned to complete the construction of this Rs. 589-million project in two years. Mrs. Pavithra Wanniarachchi, Minister of Transport, commenced the construction work of the double track railway line on November 20 and officially inaugurated the CITY BUS service in Kandy.

Balance work of Gr.1 & Gr.11 Quarters at MRIA

Project Name

Balance work of Gr.1 & Gr.11 Quarters at MRIA.

Estimated Cost (Rs.Mn.)

AASL-63

Progress

Contract awarded & Construction in progress.

BIADP 11-2 Construction Works

Project Name

  • Package A- Main Terminal Building, Pier No.02 & Elevated Road way Package C-Pier No 03, Multi Storied Car Park, etc
  • Package B - Apron, Taxi way & Utilities

Estimated Cost (Rs.Mn.)

  • FA-JPY 74397
  • Included in the above cost

Progress

  • Package A Bidding documents submitted to Chairman CAPC on 24.06.2016
  • CAPC convened on 12.4.2015 approved bidding document Tender briefing was held on 5.8.2016.

BIADP ii-2 Consultancy

Project Name

  • Detailed Design and Post Design Consultancy Services.
  • Renovation of Arrival Walkways at the Terminal Building, Bandaranaike International Airport Katunayake

Progress

  • Negotiation for the contract amendment concluded on 23.6.2016.

Check - in area expansion

Project Name

Check-in area expansion

Estimated Cost (Rs.Mn.)

AASL-1000

Progress

Feasibility Study

Construction of a New Communication Link Building at BIA

Project Name

Construction of a New Communication Link Building at BIA.

Estimated Cost (Rs.Mn.)

AASL-80

Progress

Re-Designing the Building.

Electronics mall & Immigration area modification

Project Name

Electronics mall & immigration area modification.

Estimated Cost (Rs.Mn.)

AASL-400

Progress

Clarification from the Bidders for Bid evaluation.

Emigration area re-development-Departure

Project Name

Emigration area re-development-Departure

Estimated Cost (Rs.Mn.)

AASL-300

Progress

Layout drawing of the new emigration area was finalized with the consent of immigration officers. Structural designs in progress.Some Architectural drawings to be amended. New floor to be added in order to accommodate A/C requirements and Structural designs to be re-done accordingly.

Expansion of Departure public concourse & Garden Shops

Project Name

Expansion of departure public concourse & Garden Shops

Estimated Cost (Rs.Mn.)

AASL-255

Progress

Bids opened on 14.06.2016 & Bid evaluation was in progress.

Expansion to Control Tower Cabin-BIA

Project Name

Expansion to Control Tower Cabin-BIA.

Estimated Cost (Rs.Mn.)

AASL-120

Progress

Requirement study and designing.

Installation of ADS-B Ground Stations

Project Name

Installation of ADS-B Ground Stations.

Estimated Cost (Rs.Mn.)

AASL-220

Progress

  • Site Survey conducted.
  • Design 90% completed.
  • FAT & Training scheduled.
  • Manufacturing commenced.

Modernisation of Aero Mobile Centre (HF Communicaton)

Project Name

Modernisation of Aero Mobile Centre (HF Communication).

Estimated Cost (Rs.Mn.)

AASL-100

Progress

Drafting of bidding documents.

New Navigational Services Building at BIA

Project Name

New Navigational Services Building at BIA

Estimated Cost (Rs.Mn.)

AASL-200

Progress

Design scrutinized. Re-drafting bidding document.

Runway Overlay & Associated Works at BIA

Project Name

Runway Overlay & Associated works at BIA

Estimated Cost (Rs.Mn.)

AASL - 156 , FA-9,188

Progress

For both construction & consultancy contract-financial proposals were evaluated & negotiation was in progress.

Supply, Installation and commissioning of Aeronautical HF Transmitters with antennas at HF transmitting station - Attidiya

Project Name

Supply, Installation and commissioning of Aeronautical HF Transmitters with antennas at HF transmitting station - Attidiya

Estimated Cost (Rs.Mn.)

AASL-220

Progress

Bids evaluated & initial report has been submitted to CAPC.

Supply, Installation and commissioning of Aeronautical Information Management (AIM) System

Project Name

Supply, Installation and commissioning of Aeronautical Information Management (AIM) System

Estimated Cost (Rs.Mn.)

AASL-260

Progress

Bidding document is at Scrutinization stage.

Supply, Installation and commissioning of Air Traffic Management (ATM) System at BIA

Project Name

Supply, Installation and commissioning of Air Traffic Management (ATM) System at BIA.

Estimated Cost (Rs.Mn.)

AASL-320

Progress

Amendments to the specifications are being carried out.

Upgrading of Communication Systems at BIA & RMA

Project Name

Upgrading of Communication Systems at BIA & RMA

Estimated Cost (Rs.Mn.)

AASL-420

Progress

Awaiting Cabinet decision for project approval in principle.

Walkways Refurbishment

Project Name

Walkways Refurbishment (a. Departure walk ways B. Arrival walkway)

Estimated Cost (Rs.Mn.)

AASL-285

Progress

Arrival walkways contract was awarded on 27.05.2016. Departure walkways bid evaluation completed & report sent for MPC meeting scheduled on 04.07.2016